You don't have javascript enabled. Good luck with that.
Pencarian
Tanggul Penahan Abrasi Sepanjang 25 Meter Dibangun Di Pulau Sebira

Breakwater Built on the East Side of Sebira Island

Thousand Islands Water Resources (SDA) Sub-agency built breakwater on the east side of Sebira Island, RT 04/03, Harapan Island Urban Village, North Thousand Islands.

We use 1,000 massive cube blocks to build breakwater in order to protect Sebira Island from waves

Thousand Islands SDA Sub-agency Head, Hendri deployed 10 personnel to build the breakwater.

"We use 1,000 massive cube blocks to build breakwater in order to protect Sebira Island from waves," he said, Wednesday (10/20).

Collapsed Breakwater on Panggang Island Being Repaired

He explained that breakwater on the east side of Sebira Island will be built along 25 meters. While the current progress has reached 16 meters.

"The work has been started since October 2021 and targeted to be completed by the end of this month," he conveyed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye938 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye827 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye653 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye515 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye508 personAldi Geri Lumban Tobing